Install Updates
The way to install an update depends if it is a minor or major Update. It is not necessary for users of the Mirage hosting service.
Major Update from version 3.0 to version 3.1
Version 3.x uses a complete new infrastructure and therefore needs a full new installation.
System requirements have changed. Before you start with the main installation first install the required new components.
1. Backup
Backup the complete directory, especially important is
Note: The MSI installer will automatically create a backup folder
2. Install new components The Activation Server version Web Administration Interface needs new components like ASP.NET 3.5 SP1 or the Open XML SDK. Check the system requirements and start the install-activation-server.msi to find out, which components are missing.
3. Install the Activation Server
Install the Activation Server as using the MSI installer described in detail here.
If you want to replace/update an existing Activation Server, the Virtual directory name must match the name you use in your application. A backup from the selected folder is generated and the SQL login data is automatically retrieved (see next page - Configure SQL Server).
4. Perfom System Check Use the System Check to find out, if the system is properly configured. If you get an error, see Troubleshooting. Also make sure that you again set all necessary rights for the ASP service.
Test the Administration Interface and login as administrator.
5. Update your data
Your individual configuration settings are automatically preserved with the MSI installation.
If you used the ZIP installation, you have to change the new files and add your values, as there have been a lot of new settings.
Restart the IIS server
6. Update E-Mail Activator Service The E-Mail Activator Service has changed. It supports now saving address information which has been sent with the e-mail.
|
A Service Pack is available and must be installed to support all features of the latest Licence Protector version.
• | Download the service pack ZIP file |
• | Backup the complete installation folder |
• | Unzip the content of the ZIP file into the installation folder |
• | If you use the E-Mail Activator install the Install E-Mail Activator Service 3.1 with the files provided in the service pack ZIP file |
• | Restart the server |
New configuration settings
If you update from version 3.0 to 3.1 we recommend adding the following new configuration settings and options, although they are only necessary for projects using Licence Protector DLL 3.00 or later
New settings in project.config file
Check the template demo-easygo.config on the folder ..\EasyGo\Web Activation Server\Running own Server\pconfig or ..\EasyGo\Web Activation Server\Files for Mirage Hosting\pconfig.
Changes in workflow file
You have to rebuild your workflow files in the folder \alg. This step is mandatory.
Check the template config-workflow-easygo.xml on the folder ..\EasyGo\Web Activation Server\Running own Server\alg or ..\EasyGo\Web Activation Server\Files for Mirage Hosting\alg.